REA DALMINE S.p.a. has entrusted Walley Design with an engineering intervention for the integration of an existing waste-to-energy plant, with the addition of a second turbine and relative connection to the district heating plant.
The activity entrusted to Walley Design begins with the scanning of the intervention area with a 3D Laser Scanner, and then proceeds with the feasibility study for the development of the piping of the new turbine and the relative finalization of the project complete with: piping class, layout and Battery Limits, material BOM, isometrics, piping layout, constructive supports and stress analysis with respective calculation report.
